See where the money is at risk — without losing the site context.

Hirentra separates normal project commitment from actionable commercial exceptions. Directors and QS/Commercial teams can see open PO value, avoidable hire exposure, invoice exceptions and project-level commercial attention beside the operational and progress context that explains them.

Open PO valueAvoidable exposureInvoice exceptionsLive hireProject riskExecutive actions
DIRECTOR CLARITY

Delivery can be green while Commercial Control is red.

That is useful information, not a contradiction. A project can be ahead of programme while blocked POs or avoidable hire costs require QS/Commercial intervention. Hirentra keeps those lenses separate so the Director challenges the right team for the right reason.

1

Open PO value

Bring current commitment and blocked PO context to the top of the commercial view.

2

Avoidable exposure

Separate avoidable hire cost from legitimate live project commitment and show the value in context.

3

Invoice exceptions

Surface review, dispute and overdue positions instead of burying them inside a generic finance total.

4

Primary commercial issue

Each project can lead with the single issue that explains why intervention is required.

5

Progress context

Review commercial risk beside measured delivery without turning programme and commercial health into one misleading traffic light.

6

Owned intervention

Create an Executive Action from the exception, assign the responsible role/person and retain closure history.

MANAGEMENT LOOP

Detect → understand → assign → resolve → audit.

01Detect exception
02See project context
03Create action
04Assign owner
05Resolve
06Retain history
CONNECTED PLATFORM

Commercial Control sits beside Hire Operations and Site Progress.

That combination is where Hirentra becomes more useful to a contractor: the commercial team can challenge POs and invoices with operational hire evidence and a current view of what the site is actually delivering.

FAQ

Commercial Control questions

What does Hirentra Commercial Control show?

It can show open PO value, avoidable hire exposure, invoice exceptions, live hire exposure and project-level commercial attention using the same operational context as the site.

Does high hire spend automatically make a project critical?

No. Hirentra separates normal live hire commitment from actionable commercial exceptions such as PO blockers, avoidable cost or invoice problems.

Can Directors separate delivery health from commercial health?

Yes. Portfolio Progress and Commercial Control use separate lenses so a project can be on programme but still require commercial intervention.

Can a commercial exception be assigned to someone?

Yes. Authorised Directors can create an Executive Action from a commercial exception and assign ownership, due date and required response while retaining the audit trail.

ONE PROJECT PILOT

Put a real commercial exception through the complete Hirentra workflow.

Test hire exposure, POs, invoice control, measured progress context and Director intervention on one live project.